Mark Thomas Drive and Sloat Avenue Separated Bike/pedestrian Path Study, Preliminary Design, and Environmental Document
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Purchasing 909 395-2012
purchasing@Ontarioca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
SCOPE OF WORK This specification is meant to be performance based but does provide general guidelines for the Contractor. The
Description of Work. The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to
SCOPE OF WORK: A scope of work shall be provided responding to and expanding on the general scope of services
Project Description Project Scope Summary. The Project is a 3-story 156,384 square-foot facility with 71 classrooms. The classroom count includes
THIS PROJECT INCLUDES 2024 SUMMER ROOF RESTORATION PROJECT
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.