Joint Outfall F Unit 7A Trunk Sewer Rehabilitation

The work consists of rehabilitation of approximately 4,806 feet of existing 27-inch to 60- inch diameter reinforced concrete pipe (RCP) of the Joint Outfall F Unit 7A Trunk Sewer and the Orr and Day Road Trunk Sewer with cured-in-place pipe (CIPP) liner, rehabilitation of approximately thirteen (13) manholes with a protective coating system, and all appurtenant work.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 09/12/2023 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $5600000
Engineer’s Est. Max: $7600000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Robert C. Ferrante 562‐908‐4288
bids@lacsd.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 09/12/2023 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.