*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
Installation of new DG Pathway & Refresh of Existing Park DG Pathways
- Post ID: 208176
- Posted: 11/16/2023
- Updated: 12/18/2023
Project Information
*BidAmerica Membership is required to view all information.*
Agency Information
*BidAmerica Membership is required to view the agency contact information.*
cynthia.iwanaga@morganhill.ca.gov
Documents Available
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Other Projects
On-call Concrete Services – Installation, Maintenance and Repair of Curbs, Gutters, Sidewalks, and Related Items (OM2405)
Scope of Services The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and
Oxnard Tennis Center Court Improvements
DESCRIPTION:The Project includes designing and constructing six (6) tennis courts and twelve (12) pickleball courts in an area measuring 240
On-Call & Environmental Planning Services
SCOPE OF SERVICES The purpose of this Request for Proposal (RFP) and Statement of Qualifications is to provide interested consultant
Mark Thomas Drive and Sloat Avenue Separated Bike/pedestrian Path Study, Preliminary Design, and Environmental Document
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
LANDSCAPE AND IRRIGATION MAINTENANCE FOR LMD 6R, LMD 9, AND LMD 10 PARKWAYS, PASEOS, AND MEDIANS
Scope of Services Please download the RFP documents for further information regarding RFP preparation, submittal and Scope of Services.
Questions / Comments
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.