Rialto Pipeline Rehabilitation
Scope of Services The work consists of removal and replacement of approximately 35 linear feet of 121.5-inch diameter steel pipe
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Mark Brownrigg 714-765-4182
MBrownrigg@anaheim.net
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Services The work consists of removal and replacement of approximately 35 linear feet of 121.5-inch diameter steel pipe
SCOPE OF WORK The contractor shall furnish all travel, parts, labor, materials, rentals, equipment, disposal, transportation, permits, plans, inspections, and
Notice is hereby given that BUENA PARK SCHOOL DISTRICT has elected to participate in the California Uniform
Public Construction Cost
SCOPE OF WORK:Submit all required samples, product data, certificates, operations and maintenance instructions, guarantees, and other submittals no later than
Scope of Services Contractor shall furnish and install all equipment in accordance with specifications, plans, codes, and standards. The work
Scope of Services The work of improvement consists of furnishing all materials, equipment, tools, labor, and incidentals as required by
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.