OWTP Headworks Variable Frequency Drive Replacement Project
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
bids@lacsd.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
Scope of Services The City of Pomona is seeking informal quotes from qualified firms for resurfacing 13 basketball courts and
Scope of Services Project includes mobilization, traffic control, manhole cover adjustment, manhole frame and lid replacement, water valve can adjustment,
SCOPE OF WORK All Work shall be performed in accordance with the provisions of the Contract Documents, as described in
THIS PROJECT INCLUDES Playground Installations at Various Schools
Introduction: The University of California, Santa Barbara (“University”) requests a written
response to Request for Qualifications (“RFQ”) No. FM240450 from
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.