*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Fabricate and Install Gas Turbine Exhaust Ducts at A. K. Warren Water Resource Facility

SCOPE OF WORK The contractor shall provide all labor, equipment, and materials for this project. The project shall include the following tasks. Fabricate exhaust ducts as per drawing and material specifications. The contractor shall verify the dimensions. Duct inlet flange, mating to GT exhaust expansion joint flange. Duct outlet flange, mating to HRSG inlet expansion joint flange. Duct lengths match locations of GT exhausts and HRSG inlets Duct and support structure elevations Support structure anchor locations Locations of thermowell

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/21/2024 – 11:00 AM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:8903409

952-233-1632
info@questcdn.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/21/2024 – 11:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.