*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Environmental and Engineering Design Services

SCOPE OF WORK Owner requests a change in the requirements of the SOW that the Consultant contends is material and justifies an increase in compensation, Consultant must, within fourteen (14) calendar days of the Owner’s request, advise the Owner in writing of such contention before proceeding with such change. If written notice is not given to Owner within such 14-day period, such change shall be deemed immaterial, and Consultant shall not be entitled to additional compensation for such change. If Owner causes a change in the Service(s) or Deliverable(s) that Consultant believes to be material, Consultant must, within fourteen (14) calendar Days of the event that caused such change, notify Owner in writing that Consultant contends Owner has caused a material change in the Service(s) or Deliverable(s). After said notification, Consultant must provide such Service or Deliverables as directed by OPM.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/07/2024 – 12:00 AM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:22035 – RFQ/P

Patrick Zuroske (805) 568-3096
pzuroske@countyofsb.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/07/2024 – 12:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.