Traffic Signal Battery Backup system (BBS) Deployment
THIS PROJECT INCLUDES Traffic Signal Battery Backup System (BBS) Deployment
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Tyler Nash,(530) 225-4135
tnash@cityofredding.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
THIS PROJECT INCLUDES Traffic Signal Battery Backup System (BBS) Deployment
SCOPE OF WORK This specification is meant to be performance based but does provide general guidelines for the Contractor. The
SCOPE OF WORK Huntington Beach Union High School District (District) desires to contract with one highly qualified Bidder to pick
Scope of Services The work consists of demolition of a 50 MW gas turbine power plant, grading and installation of
DESCRIPTION OF WORK: Project Background Information and Purpose The purpose of this RFP is to seek proposals from qualified firms
THIS PROJECT INCLUDES Cambridge High School Sitework and Portable Improvement
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.