FOSTER LANE SEWER REALIGNMENT SPECIFICATIONS & LANDSCAPE DESIGN PREPARATION
Scope of Work This project includes the preparation of the Landscape Construction Plans for the Foster Lane Sewer Realignment Project
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Brianna Darlington,
brianna.darlington@bart.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Work This project includes the preparation of the Landscape Construction Plans for the Foster Lane Sewer Realignment Project
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
General work description: Place asphalt rubber chip seal with replace AC surfacing .
Scope of Work The City is experiencing dynamic growth in residential and commercial electric accounts. The City is seeking a
SCOPE OF WORK This specification is meant to be performance based but does provide general guidelines for the Contractor. The
General work description: Place hot mix asphalt (Type A) and replace asphalt concrete surfacing.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.