*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

El Cerrito Swim Center Slide Demolition

SCOPE OF WORK The Scope of Work for this project includes the removal of the existing slide tower, slide flume, slide stairs and risers, This work also includes protecting all existing bolts imbedded in the foundations securing the structure, protecting and capping off of the existing water supply piping to the slide flume and the hauling away of all demolished materials to leave a clean area for the later installation of a new slide structure. Carefully cap off the existing 8” schedule 80 water supply pipe to the slide flume to 8” above the finished concrete grade and securely and carefully protect it for future use. Carefully unscrew all nuts securing the tower and stair structures to the bolts embedded in the below-grade foundations – five (5) locations. Carefully remove all structural supports from existing bolts embedded in the existing below-grade foundations, and securely and carefully protect all bolts at five (5) foundation support locations for future use.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/01/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 04/17/2024 – 3:00 PM
Engineer’s Est: We requested the engineer’s estimate from the agency on 04/18/2024. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

mcuison@ci.el-cerrito.ca.us

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/01/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.