*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Eisenhower Park Lake and Stream Maintenance

Scope of Work. Supply all equipment, biological control agents, and labor necessary for preventative and scheduled maintenance. The contractor is responsible for making him/herself familiar with all existing site conditions at the work site within the boundaries of the lake, stream, and waterfall area at Eisenhower Park, including but not limited to water features, ingress/egress and plant material that is to be maintained. the maintenance contractor is to maintain the job site in a safe condition at all times. Park amenities shall be left in a clean, neat, and safe condition after each workday.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/04/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 02/20/2024 – 10:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:23-24.27

Paul Miller
pmiller@cityoforange.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/04/2024 – 2:00 PM

Other Projects

Wireless Master Plan

Scope of Work The selected firm will be responsible for the following: Wireless Inventory, Mapping and Analysis: Conduct a comprehensive

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.