*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Effluent Manifold Coating Project

SCOPE OF THE WORK: SacSewer (EchoWater)operates the EchoWater Resource Recovery Facility in Elk Grove, CA. EchoWater has a 96-inch steel pipe manifold that is associated with the effluent discharge system. This system has been in service since the late 1970’s and the header has not been maintained or serviced due to the location and the difficulty accessing it. A recent condition assessment of the 96-inch effluent manifold showed significant deterioration of the cold tar epoxy coating. Qualified industrial contractors are requested to provide quotes to blast and recoat the header.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/29/2024 – 3:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 04/17/2024 – 9:00 AM
Engineer’s Est. Min: $1250000
Engineer’s Est. Max: $1250000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:RFB #8470

Tamblynn Stewart (916) 875-9014
stewartt@sacsewer.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/29/2024 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.