*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Design and Construction of the City of Banning Wastewater Treatment Plant and Recycled Water Upgrades Project

SCOPE OF WORK: The City of Banning is responsible for the collection, conveyance, treatment, and disposal of wastewater generated within its service area. The local collector sewers discharge into larger sewer trunk mains, then to the Banning WWTP, located in the southeast corner of the City (see Figure 1 under attachments). The WWTP has a current capacity of 3.6 million gallons per day (“MGD”) and is designed to treat wastewater to secondary standards. The WWTP consists of preliminary treatment, primary treatment, secondary treatment, solids handling, disinfection (currently not in use), and evaporation/percolation ponds. The preliminary treatment system consists of a mechanical bar screen, compactor, grit removal system, and cyclone separator.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/03/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:RFQ-24-063

Barbara Mason (951) 922-3121
bmason@banningca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/03/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.