Construction of the 13th Ave., Mission Lakes Blvd., and Thomas Ave. Tropical Storm Hilary Water Line Replacement Project
Scope of Services Remove and replace existing water lines at 13th Ave., Mission Lakes Blvd., and Thomas Ave. and Mission
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
John Moredo-Burich (707) 267-9366
jmoredo2@co.humboldt.ca.us
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Services Remove and replace existing water lines at 13th Ave., Mission Lakes Blvd., and Thomas Ave. and Mission
Scope of Services The following provides the framework for the scope of services required and any additional information that the
PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and
Scope of Services Full asphalt remove and replace per plans and specifications
PROJECT DESCRIPTION: The Work is located along Powell Street, from Geary Street to Ellis Street, and the cable car island
Project Description: This solicitation is intended to obtain the services of a general contractor for construction of the David March
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.