*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Clear Creek Road Scour Mitigation

Description: The Project is located along Clear Creek Road, in Placerville in the County of El Dorado. The Work to be done is shown on the Plans, and generally consists of, but is not limited to: Clearing and grubbing, earthwork and grading as part of the scour mitigation, tree removal, sawcut, shoulder backing, and paving roadway. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/07/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 04/25/2024 – 2:00 PM
Engineer’s Est. Min: $350000
Engineer’s Est. Max: $350000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:8397740

Jen Rimoldi 530-621-7592
jennifer.rimoldi@edcgov.us

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/07/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.