Fort Bragg Fire Station Roof Replacement Project
Scope of Work for the Fort Bragg Fire Station Roof Replacement Project The duty of the Contractor will be to
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Allen Law 510-238-6940
alaw@oaklandca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Work for the Fort Bragg Fire Station Roof Replacement Project The duty of the Contractor will be to
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all
PROJECT DESCRIPTION The existing Tanner Water Treatment Plant (WTP) does not have sufficient backwash capacity (storage, recycling, pumping and sludge
General work description: Cold plane and place HMA.
PROJECT DESCRIPTION: The scope of work for this project consists of, but is not necessarily limited to the following: Removal
Project Description Phase I of this project will include conducting hydrologic and hydraulic (H&H) studies and developing 100% design plans
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.