*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

BNR-PEPS Erosion Repair Project

SacSewer (EchoWater) operates the EchoWater Resource Recovery Facility in Elk Grove, CA. SacSewer recently completed construction of the BNR and PEPS facilities as part of the EchoWater Project. Soil erosion has occurred on various earthen slopes adjacent to these newly constructed facilities.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/16/2024 – 3:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 05/01/2024 – 9:00 AM
Engineer’s Est. Min: $490000
Engineer’s Est. Max: $490000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:RFB #8476

Scott Mueller at muellers@sacsewer.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/16/2024 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.