Grossmont College Perimeter Road Phase II- Rebid
Scope of Work – The scope of the Grossmont College Perimeter Road Repair Phase II will include a pavement condition
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Alex Bryson
alexander.bryson@oside.us
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Work – The scope of the Grossmont College Perimeter Road Repair Phase II will include a pavement condition
SCOPE OF WORK Huntington Beach Union High School District (District) desires to contract with one highly qualified Bidder to pick
SCOPE OF WORK Tree Maintenance Services Overview All trees shall be trimmed to a height of fourteen (14) feet over
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform
Scope of Services Edinger Ave (Countess to Saybrook) The project consists primarily of cold milling of the existing pavement, Cold
PROJECT DESCRIPTION: The scope of work for this project consists of, but is not necessarily limited to the following: Removal
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.