*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

AVUSD: Modular TK Classroom Buildings

SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, utility services and transportation and perform and complete all work required in connection with the construction of: AVUSD: MODULAR TK CLASSROOM BUILDINGS In strict accordance with the Contract Documents enumerated in Article 8 below. The Contractor shall be liable to the District for any damages arising as a result of a failure to comply with that obligation, and the Contractor shall not be excused with respect to any failure to so comply by act or omission of the Architect, Construction Manager, Engineer, Inspector, Division of the State Architect, or representative of any of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and unless the Contractor protests at the time of such alleged prevention that the act or omission is preventing the Contractor from fully complying with the Contract Documents. Such protest shall not be effective unless reduced to writing and filed with the District office within three working days of the date of occurrence of the act or omission preventing the Contractor from fully complying with the Contract Documents

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 01/04/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 12/13/2023 – 11:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Chase Cooper, (909) 552-4887
ccooper@cpmcrew.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 01/04/2024 – 2:00 PM

Other Projects

R-16.2 PIPELINE

DESCRIPTION OF WORK: The Work includes the provision of all equipment, labor, and materials necessary to complete the construction of

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.