*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Alameda de las Pulgas Corridor Analysis and Hillsdale Boulevard at Alameda de las Pulgas Traffic Signal Design

Through completion of a corridor analysis, which will assess current and future roadway operations on Alameda de las Pulgas with and without bicycle facilities, and stakeholder and community engagement, City of San Mateo | 2 the Project will scope and complete traffic signal design plans for the Hillsdale Boulevard at Alameda de las Pulgas intersection. The corridor traffic analysis for Alameda de las Pulgas will also identify high-level operational scopes for potential future traffic signal projects at 28th , 31st, and 36th Avenues.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/21/2023 – 4:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Sang Hee Cho (650) 522-7348
scho@cityofsanmateo.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 06/21/2023 – 4:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.