Fort Bragg Fire Station Roof Replacement Project
Scope of Work for the Fort Bragg Fire Station Roof Replacement Project The duty of the Contractor will be to
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Mariela Delgado (661) 286-4066
mdelgado@santa-clarita.com
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Work for the Fort Bragg Fire Station Roof Replacement Project The duty of the Contractor will be to
Scope of Services The work to be performed consists, in general, of installation of adaptive controllers, fiber optic cable, modems,
SCOPE OF WORK: The Contractor shall perform within the time stipulated the contract as herein defined, and shall provide all
General work description: Cold plane and place HMA.
SCOPE OF WORK Engineering Services: Civil Engineering Services: Including but not limited to site development, infrastructure design, and transportation engineering.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.