*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
YCCD – Modesto Junior College East Campus Men’s P.e. Bldg. HVAC Replacement
- Post ID: 235659
- Posted: 05/22/2024
- Updated: 05/23/2024
Project Information
*BidAmerica Membership is required to view all information.*
Agency Information
*BidAmerica Membership is required to view the agency contact information.*
(559) 437-0887
jamie.hickman@teterae.com
Documents Available
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Other Projects
Carrillo Gymnasium Exterior Renovations
Scope of Services Rehabilitation of an existing historic gymnasium building, originally constructed in the mid -1920’s. Scope consists of repairs
Fire Protection Monitoring and Maintenance
SCOPE OF WORK Service Provider shall maintain the alarm systems and associated equipment in good operating condition in accordance with
Primary Deck Rehabilitation Project Phase 4: Slide Gate and Hatch Repairs
SCOPE OF WORK The intent of the work described in these construction documents for the Primary Deck Rehab Project –
Vernon Middle School Relocatable Classroom Bldg. Project
PROJECT DESCRIPTION Summary Project Description: relocatable classroom buildings with related site work. Contract Scope: Construction, demolition, and renovation. Contract Terms:
Cathedral Oaks Non-Native Tree Removal
Project Description Established in 1972, the Midpeninsula Regional Open Space District (Midpen, District) is an independent special district that has
Questions / Comments
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.