Hickory Basin Monitoring Well
The Work consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, install, commission, start
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Frank Padilla 213-891-2360
PadillFO@email.laccd.edu
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
The Work consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, install, commission, start
THIS PROJECT INCLUDES SPECIFICATIONS FOR THE CONSTRUCTION OF FY 2024-25 ANNUAL MAJOR STREETS REHABILITATION PROGRAM: SYCAMORE DRIVE (ALAMO STREET TO
The Information Technology Department of the San Diego Unified Port District “District” has a
requirement for Uninterruptible Power Supply (UPS)
NOTICE IS HEREBY GIVEN that the DESERT COMMUNITY COLLEGE DISTRICT (“District”),
acting by and through its Board of Trustees, will
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.