*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

The Installation of Multiple Electric Vehicle Charging Stations at the Sweetwater Authority Operations Center and Robert a. Perdue Water Treatment Plant

SCOPE OF SERVICES The scope of services for completing this work is as follows: Operations Center EV Charging Stations The procurement and installation of (3) ChargePoint EV chargers Model # CT4021-GW1 and (1) ChargePoint EV charger Model # CPE250C, all onto existing concrete pads. All work shall include installation of vehicle connection cabling and programming of any software required to commence usability. This work will be conducted at the Operations Center located at 744 ‘F’ Street, Chula Vista, CA 91910. This table is not considered allinclusive, and the consultant shall be responsible for verification and procurement of all required equipment and parts necessary to complete scope of services.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/17/2024 – 3:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Aaron Elwood (619) 409-6849
aelwood@sweetwater.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/17/2024 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.