*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Technology Upgrades AP Giannini Middle School

The Project is generally described as including but not limited to: Technology and data upgrades that include but are not limited to two new IDF room build-outs with additional electrical work to accommodate expansion; new data network equipment and connections in each IDF to accommodate expanded technology requirements affecting the Gymnasium building, main building, classrooms, administrative offices, corridors, other service areas; installation of data and phone network equipment and systems; DoT racks and technology equipment with associated conduit, cabling, fiber, electrical wiring, and panels; and, demolition and removal of abandoned equipment and materials, hazardous materials removal at AP Giannini Middle School.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/23/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 05/16/2024 – 9:00 AM
Engineer’s Est. Min: $236500
Engineer’s Est. Max: $236500

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:12385

(415)537-2235
sf@e-arc.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/23/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.