GREER PARK BASKETBALL COURT RESURFACING PROJECT
SCOPE OF WORK Furnish all labor, equipment, materials, and incidentals necessary and provide separate temporary facilities for the CONTRACTOR’s use
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Louis Sessler (949) 582-4947
lsessler@saddleback.edu
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK Furnish all labor, equipment, materials, and incidentals necessary and provide separate temporary facilities for the CONTRACTOR’s use
Scope of Work The purpose of this geotechnical study was to investigate the upper 51.5 feet of subsurface soil at
General work description: Convert continuous yellow flashing beacon to pedestrian signal.
Scope of Services SEJPA is seeking bids from qualified contractors with demonstrated experience in construction of a Water Tank rehabilitation.
Scope of Services The San Diego Unified School District through this Invitation to Bid (ITB) is interested in awarding a
PROJECT SCOPE: The operations firm will be responsible for system operation of a 0.5 mgd average annual flow membrane bioreactor
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.