*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Structural Reach Replacement

Scope of Work. The work to be done consists of furnishing labor, material and equipment required to complete the project in the particular locations, of forms, sizes and dimensions and of the materials and to the lines and grades and in the elevations as shown and delineated upon the plans and specifications made therefore. The following information is presented to indicate the size of the project and no warranty is made or intended to final quantities: The project includes, but is not limited to, the removal and replacement of existing 6-inch and 8-inch VCP with 8-inch HDPE sewer mains using pipe reaming/ horizontal directional drilling (HDD) pipe replacement construction methods, sewer lateral reconnections, sewer manhole reconnections, surface restoration, traffic control, mobilization, stormwater control, utility coordination, sewage bypassing, video inspection of the segments, removal of the outside drop pipe system, existing sewer main abandonment in place, survey referencing of existing survey monuments, reinstallation of existing survey monuments if disturbed during construction, and all other work as shown on the Plans and as called for in the Project Specifications and as directed by the Engineer.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/30/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:WW01002

Scott Reeves
sreeves@losaltosca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/30/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.