*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

San Cayetano Elementary School New Shade Structures, New Play Structure, Entrance Modifications & Restroom Alteration Project

SCOPE OF WORK: The work of this Section includes but shall not be limited to provision of the following: Fire alarm system modifications complete with conduits, wiring, equipment, and connections. Removal of existing electrical systems and equipment which will be affected by the work of this Contract and reinstallation of same as shown or as is required. Work in existing facility and shut down of existing services shall be performed only at times approved.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/11/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 03/20/2024 – 3:00 PM
Engineer’s Est. Min: $5000000
Engineer’s Est. Max: $5000000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2024-005

RJ Stump
r.j.stump@fillmoreusd.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/11/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.