*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Rosemead High School Gymnasium HVAC Project

SCOPE OF WORK A. Except where otherwise noted, the system shall consist of a network of commercial Internetprogrammable thermostats, their accessories, and any other networked climate management device(s) required to fill the intent of the specification, sequence of operations, and provide for a complete and operable system. B. The BAS contractor shall review and study existing building/site conditions where applicable and all new construction drawings for the project including HVAC drawings and the entire project specifications to familiarize themselves with the equipment and system operation prior to bidding and submittal of a bid/price and notify the owner immediately of any conflicts between the project and the scope of work of this section, including work to be completed by others. C. All equipment and installation of control devices associated with the equipment listed below shall be provided under this BAS contractor.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 11/27/2023 – 1:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 11/06/2023 – 10:00 AM
Engineer’s Est. Min: $2250000
Engineer’s Est. Max: $2250000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2023-24(B5)

MARGARITA SANCHEZ, (626) 444-9005
PURCASING@EMUHSD.ORG

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 11/27/2023 – 1:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.