LA PALMA PARKWAY PROMENADE & SWAN STREET IMPROVEMENTS (RE-BID
The project will convert North La Palma Parkway, from a two-way street, into a one-way
tree-lined, pedestrian and bicycle friendly
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Lisa Jacobs 661-827-3122
lisa_jacobs@kernhigh.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
The project will convert North La Palma Parkway, from a two-way street, into a one-way
tree-lined, pedestrian and bicycle friendly
Construction of 2024 Storm Drain Project, Project No. 014-9744, including, but not limited to: mobilization; traffic control and construction signage;
THIS PROJECT INCLUDES RECREATION CENTER – POOL SLIDE REPAIR & REFURBISHMENT
SCOPE OF WORK All Work shall be performed in accordance with the provisions of the Contract Documents, as described in
Scope of Services Contractor shall furnish and install all equipment in accordance with specifications, plans, codes, and standards. The work
Install new 2” conduit and telemetry line between two existing pull boxes in Fountaingrove
Pkwy from Thomas Lake Harris Dr
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.