*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

NONDESTRUCTIVE ELECTROMAGNETIC INSPECTION OF WEST PIPELINE

This solicitation request is to procure professional technical services for the Electromagnetic Inspection of the welded steel pipe in the West Pipeline (WPL) from the Rinconada Water Treatment Plant to the Grainger Turnout. The WPL Inspection and Rehabilitation Project will be conducted in two Phases. The WPL Phase 1 shutdown is scheduled for 1 November 2024 to 30 March 2025 and the WPL Phase 2 shutdown is scheduled for 1 November 2025 to 30 March 2026. Advertisement of the Construction Contract for the WPL Phase I work will occur in February 2024. Valley Water would like to have this procurement completed and finalized by August 2023, so that staff may have time to plan and coordinate with the Successful Proposer.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 08/02/2023 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 07/10/2023 – 10:30 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:VW0271

Kevin Kelley 408-630-2421
kkelley@valleywater.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 08/02/2023 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.