DISTRICT WIDE SEPTIC PUMPING SERVICE
DESCRIPTION OF WORK: The CONTRACTOR’S designee shall leave a Work Ticket with the Project Manager at the job site. This
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Chris White (951) 308-6388
Chris.White@TemeculaCA.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION OF WORK: The CONTRACTOR’S designee shall leave a Work Ticket with the Project Manager at the job site. This
SCOPE OF WORK The work to be completed by the contractor shall consists, in general, of furnishing all labor, materials,
The scope of work for the Master Agreement for Public Works Fleet & Facility Services shall
include maintenance, repair, replacement,
Scope of Work FUEL TANK TESTING, ANALYSIS, AND CLEANING SERVICES
Scope of Services REMOVE AND REPLACEMENT OF ACCESSIBLE DRINKING FOUNTAINS; INSTALLATION OF LOCKER ROOM PRIVACY STALLS IN GYMNASIUM (BUILDING “N”);
SCOPE OF WORK: Contractor agrees to furnish all tools, equipment, apparatus, facilities, labor and materials necessary to perform and complete
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.