*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Monte Vista Stormwater Detention Basin Analysis

The City of Vista owns and operates an existing stormwater detention basin located on Monte Vista Dr., just east of South Santa Fe Dr. Construction of this basin was completed in 2013 as part of the South Santa Fe Redevelopment Drainage Project that was responsible for controlling drainage in the Paseo Santa Fe redevelopment area. As a result, a Letter of Map Revision was submitted and approved by FEMA, redefining the 3 flood limits in the area. Immediately upstream and easterly of the 2013 detention basin (Monte Vista Basin) are two smaller existing detention basins that were previously studied but not improved

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 07/31/2023 – 4:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est: We requested the engineer’s estimate from the agency on 07/07/2023. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Steven Nowak 760-643-5403
snowak@ci.vista.ca.us

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 07/31/2023 – 4:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.