Long Range Facilities Plan Updat

General The City owns and operates the RWQCP, which treats wastewater from a total of six partner agencies (Partners), including the City. The RWQCP has a permitted dry weather capacity of 39 million gallons per day (MGD), an annual average treated flow of 16 to 18 MGD, and a wet weather capacity of 80 MGD. In 2012, a Long Range Facilities Plan (LRFP) was completed to identify the needs at the RWQCP for continued, compliant operations. To date, several of the needs identified in the 2012 LRFP have resulted in projects that have either been completed or are underway. They are as follows: Sludge Dewatering and Loadout Facility (completed in 2019), Primary Sedimentation Tank Rehabilitation and Electrical Room Upgrade (in construction and expected to be completed in December 2023)

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/06/2024 – 3:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 09/18/2023 – 10:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:WQ-19002-030

Nanette O’Brien
nanette.obrien@cityofpaloalto.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/06/2024 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.