*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Joint Intercepting Sewer Rehabilitation, Phase 1 Construction

Description of Project: Rehabilitate 2,306 linear feet of 72-inch diameter joint intercepting sewer (sewer interceptor) reinforced concrete pipe between MH-04 and JB-1 as well as another 89 linear feet of sewer interceptor between JB-1 and JB-0. The scope of work includes, but is not limited to, the following: rehabilitation of MH-03 and MH-02; bypass pumping around the intercepting sewer; pipeline cleaning and rehabilitation; disposal of waste; manhole and lateral reinstatement; bypass system removal and reinstatement of intercepting sewer service; and restoration of disturbed areas.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 10/16/2023 – 3:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 09/19/2023 – 2:00 PM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:189237

Nanette O’Brien
nanette.obrien@cityofpaloalto.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 10/16/2023 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.