Kitchen Infrastructure Project
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Joshua Beltran (619) 644-7034
jbeltran@gafcon.com
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
Citrus Community College District (District) proposes to construct the Science Building, Project No. 03-2324 Progressive Design-Build (D-B) Teams utilizing the
Project Description: Remodel second floor of Nursing per attached plans to include 4 hospital style rooms, reconfigure
HVAC, plumbing, electrical,
PROJECT DESCRIPTION The work to be done consists of furnishing all materials, equipment, tools, supervision, labor and incidentals required to
The contractor shall perform work for Annual Carpet & Tile Repair and Replacement
SCOPE OF WORK
Work will primarily consist of the following:
• Cleaning, clearing and crack sealing
• Resurfacing
• Remove
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.