Richland Sanitary Sewer Replacement
DESCRIPTION OF THE WORK: The work to be performed includes, but is not limited to, remove and replacement of sewer
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Tracy Vera 707-543-3708
tvera@srcity.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION OF THE WORK: The work to be performed includes, but is not limited to, remove and replacement of sewer
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
Scope of Services The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required
General work description: Micropiling, structural concrete, and hot mix asphalt (Type A).
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.