*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

ESUSD Richmond Street ES Corridor Connection

SCOPE OF WORK General: Provide all materials, equipment and labor necessary to furnish and install straw wattles at locations shown on the Drawings and on Contractors' Storm Water Pollution Prevention Plan. Storm Water Pollution Prevention Plan: Contractor will be required to prepare a Storm Water Pollution Prevention Plan (SWPPP), and submit to the State Water Resource Control Board to obtain Notice of Intent approval and a WDID number. Comply with State Water Resources Control Board requirements. The SWPPP shall be provided by the Contractor prior to the start of work. The SWPPP shall be tailored to the contractor’s approach to the work in this contract. The SWPPP shall be prepared by a Qualified SWPPP Developer (QSD). The Contractor shall as a minimum address: Cut and fill operations. Temporary stockpiles. Vehicle and equipment storage, maintenance and fueling operations. Concrete, plaster, mortar and paint disposal. Dust control. Tracking of dirt, mud on off-site streets. Erosion Controls Sediment Controls

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/01/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $500000
Engineer’s Est. Max: $500000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:24-008

Stephany Chavez
schavez@telacu.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/01/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.