For Construction on State Highway in Riverside and San Bernardino Counties at Various Locations in District 08 on Route 10, 15, 60, 91, 210, 215, 259
General work description: Modifying traffic monitoring stations, bonded fiber matrix, and mulch.
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Caitlin Walker 805-897-1908
CWalker@santabarbaraca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
General work description: Modifying traffic monitoring stations, bonded fiber matrix, and mulch.
General work description: Convert continuous yellow flashing beacon to pedestrian signal.
General work description: Individual slab replacement, cold plane AC Pvmt & place HMA (Type A).
Scope of Services The City of La Cañada Flintridge invites all qualified vendors to submit quotes for Holiday Tree Lighting
The San Bernardino City Unified School District is interested in entering into a contract with a qualified
and acceptable contractor
Scope of Services The project involves upgrading the Newport Mesa Unified School District’s existing compressed natural gas vehicle time-filling facility.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.