*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

East Dunne Hillside Water Reservoir Project

SCOPE OF WORK Section 09960 provides the requirements for; coating systems, surface preparation, coating application, and quality assurance/quality control relative to the equipment, and structures listed in the Finish Schedule/Contract Drawings. Unless specified elsewhere, or shown on the Contract Drawings, the following shall not be coated: Metal completely embedded in concrete (except aluminum). Piping is buried in the ground or encased in concrete. Galvanized metal, including galvanized pipe supports, ladders and guardrails. A chain-link fence and galvanized fence gates. Rubber. Plastic pipe, including polyvinyl chloride, polyethylene, and polypropylene piping. Stainless steel. Bronze, brass. Nameplates and grease fittings. Factory-finished electrical panels. Factory fusion-bonded epoxy-coated items. Aluminum or galvanized ductwork enclosed inside furred ceiling spaces. Aluminum handrail and aluminum guardrail. Fiberglass. Electrical conduit. Copper pipe.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/29/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $8000000
Engineer’s Est. Max: $8000000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:WA6007

David Gittleson
david.gittleson@morganhill.ca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/29/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.