OWTP Headworks Variable Frequency Drive Replacement Project
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Huie Lovelady (916) 651-7834
Huie.Lovelady@CalVet.Ca.Gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
General work description: Repair spalled surface area and building roof, & replace tunnel tile.
The intent of the project is to rehabilitate an existing building
that was formerly used for dewatering and make it
The City of Ukiah completed a successful downtown streetscape project in Ukiah in 2022, which
improved the way State Street
General work description: Install fiber reinforced polymer system (column) and column casing.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.