*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Del Monte and Casa Verde Recreational Trail Intersection Improvement Project

PROJECT DESCRIPTION In 2018, the City was awarded Highway Safety Improvement Program (HSIP) Cycle 9 funding for bicycle, pedestrian and signal improvements at the intersection of Del Monte and Casa Verde including the Recreation Trail Crossing at Casa Verde Way. This project consists of: Improvements to the Casa Verde Way trail crossing and the intersection of Del Monte Avenue and Casa Verde Way Restriping of crosswalks Installation of Bicycle Crossing Installation of ADA ramps at the intersection Modifications to medians to accommodate change in crosswalks Modification to travel lanes to accommodate protected left turn Installation of mountable curb at the intersection of Casa Verde Way and Surf Way Traffic Signal Modifications to include: Protected left turn phase on Casa Verde Way Leading Pedestrian Phase Bicycle Signals

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/20/2024 – 5:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est: We requested the engineer’s estimate from the agency on 04/23/2024. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Andrea Renny (831) 646-3921
renny@monterey.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/20/2024 – 5:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.