*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Del Amo Boulevard Street Improvement From Central Avenue to Wilmington Avenue

The work to be performed under this contract consists of: Remove and Replacing damaged concrete improvements or installing new PCC at Del Amo Boulevard from Central to Wilmington; grinding and Overlay of road pavement of Del Amo Blvd from Central to Wilmington with Asphalt Rubberized Hot Mix (ARHM). Work includes furnishing all labor, material, equipment, services, and incidentals required for tree removal; PCC improvements removals and replacement; cold milling full-width AC surface 2” in thickness, and overlay with ARHM Finishing Course 2” in thickness; also, includes removal and replacement “Dig-Out” of localized failed 4” AC sections at specified locations, compacting existing CAB Base to min. 95% relative compaction;

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 08/24/2023 – 3:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 07/26/2023 – 9:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:IFB 23-15

Shelly Root 310-830-7600
sroot@carsonca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 08/24/2023 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.