*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

CUPCCAA JCES Metal Shade Structure

SCOPE OF WORK The scope of work listed for each site listed below is a general narrative for each site. Please refer to the drawings and specifications for additional project-specific information. Shade structures will be purchased by the District and will be delivered to the school site. Contractor will be responsible for coordinating delivery, unloading the trucks with required equipment and protecting the structures. Move any stored products, materials, or equipment under the Contractors’ control that interferes with the operations of the District. Coordinate the use of premises under the direction of the PSUSD Facilities Project Manager.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/08/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:23-24-04

Trevor Cornell
tcornell@dlrgroup.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/08/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.