*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Construction of Orange Line Train Control Improvements Phase 1 – Prequalification of Bidders

PROJECT DESCRIPTION MTS anticipates, subject to change in MTS’s sole discretion, the Project requiring prequalification shall generally consist of the following: Construction of Orange Line Train Control Improvements Phase 1: The work to be done includes furnishing all necessary labor, equipment, and materials for: Special Trackwork Installation of three (3) MTS furnished #11 single crossovers Conversion of two (2) existing manual #10 crossovers to MTS furnished power operated turnouts Replacement of six (6) M23 power switch machines and associated special track work with MTS provided material Installation of MTS furnished bonded rail plugs on tangent and curved track

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/07/2024 – 5:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $22000000
Engineer’s Est. Max: $22000000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:PWL399.0-24

Diana Singleton 619-557-4551
diana.singleton@sdmts.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.