DISTRICT WIDE SEPTIC PUMPING SERVICE
DESCRIPTION OF WORK: The CONTRACTOR’S designee shall leave a Work Ticket with the Project Manager at the job site. This
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Ahernandez@cityofvista.com
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION OF WORK: The CONTRACTOR’S designee shall leave a Work Ticket with the Project Manager at the job site. This
The work shall include, but shall not be limited to the following (not necessarily in the order indicated):
1. Procure
SCOPE OF ARCHITECT’S SERVICES The ARCHITECT shall provide to the DISTRICT, on the terms herein set forth, all of the
Scope of Work The purpose of this geotechnical study was to investigate the upper 51.5 feet of subsurface soil at
SCOPE OF SERVICES CONSULTANT shall provide the Services detailed in this Exhibit A, entitled “SCOPE OF SERVICES”. Notwithstanding any provision
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.