MODULAR BUILDINGS PURCHASE PCY PHASE II
SCOPE OF WORK: Any change in the scope of the Work, method of performance, nature of materials or price thereof,
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Bryan Salazar (818) 548-3993
bsalazar@glendaleca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK: Any change in the scope of the Work, method of performance, nature of materials or price thereof,
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
SCOPE OF WORK: Contractor agrees to furnish all tools, equipment, apparatus, facilities, labor and materials necessary to perform and complete
Scope of Work. The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
Description. The Project is in the Las Flores Neighborhood, and is described as follows: Pavement rehabilitation, including spot base repairs,
Scope of Services
Sewer, storm drain, and pump station maintenance, construction, repairs, immediate response. on-call, work order contract.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.