*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

City Hall Complex Roofing Project

Scope of Work The contract work for this project shall consist of restoration of existing granule surfaced built-up roof membrane per APOC Guide Specification AM1-PE-MF-252 or comparable roof restoration system for two buildings at the City Hall Complex, a shingle install for one building and repair of the tiled roof at the Norton Younglove Senior Center.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 10/17/2023 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $90000
Engineer’s Est. Max: $90000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2023-05

Mari Shakir (909) 795-9801
pworks@cityofcalimesa.net

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 10/17/2023 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.