*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Capacity Upgrades Along East Meadow Drive and Connection to Adobe Creek Pump Station From East Meadow Circle (SD-22000 and SD26000) Project

Description of Project: This project is comprised of two Storm Drain Master Plan CIP projects, the East Meadow Drive East of East Meadow Circle to Adobe Creek Pump Station Project (East Meadow Drive) and East Meadow Circle North of East Meadow Drive Project (East Meadow Circle). The Storm Drain Master Plan identifies both projects as a high-priority improvement to the City’s storm drain system. The first project location is on East Meadow Drive where the existing 36-inch pipe on East Meadow Drive is currently undersized and lacks the capacity to convey a 10- year storm runoff to the Adobe Pump Station. This project proposes to upsize the pipe to a 48-inch pipe to achieve a 10-year level of service.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 08/07/2023 – 3:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:188585

Nanette O’Brien
nanette.obrien@cityofpaloalto.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 08/07/2023 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.