*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Canyon Park Infrastructure Improvement Project

The Project Includes: Demolition of saw-cut and removal of existing: concrete, curb and gutter, headwall, gutter pan. Saw-cut and removal of existing: AC pavement, AC patch, AC Berm, AC pulverization, Cold milling of AC pavement. Remove trees, and tree stomps, cold mill AC pavement, excavation, and grading for all structures in the project. Remove chain link fence, wheel stops, AC pavement, AC pavement at parking lots, curbs, curb, and gutter, remove and salvage signs. Demolition of existing septic tanks, removal of existing sewer line clean outs and access boxes, concrete slabs at education area.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 10/18/2023 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 09/21/2023 – 10:00 AM
Engineer’s Est. Min: $7202894.50
Engineer’s Est. Max: $7202894.50

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

James Merrell
james.merrell@merrelljohnson.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 10/18/2023 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.